There are ten conditions which may hamper the pace at which your new flooring can be installed or made ready for use.
10 Factors May Slow New Floor Readiness

acclimate, acclimation, air flow, building envelope, calcium chloride moisture test, concrete slab, concrete subfloor, concrete substrate, crawl space, cure, drainage, Exterior, flatness, foot traffic, furniture handling, ground moisture, HVAC, indoor environment, moisture content, moisture test, moisture vapor emission rate, new concrete, new construction, new flooring, post-installation, relative humidity, remodel, rolling load, sealer, site condition, subfloor, subfloor preparation, subfloor testing, Temperature, testing, vapor, ventilation, wood subfloor